Drilling Mud Tank holds drilling fluid as it moves through the solids control process. Dividing the tank into several compartments keeps different parts of the mud flow separate and provides enough working volume for continuous circulation.
Mud moves between compartments through pumps and connecting lines. Agitators keep the fluid moving and mixed, which reduces solids settling in the tank.
The tank includes the space and connection points needed for pumps, agitators, and other mud-handling equipment. The compartment arrangement and tank dimensions are set around the required capacity and rig footprint.
The TRNG series covers capacities from 20 to 80 m³.




